User not logged in - login - register
Home Calendar Books School Tool Photo Gallery Message Boards Users Statistics Advertise Site Info
go to bottom | |
 Message Boards » » Paul Derr Track Page [1]  
LiusClues
New Recruit
13824 Posts
user info
edit post

I just got back from overseas and I haven't been on campus.

I was wondering if construction has finished.

9/2/2007 7:19:10 PM

FykalJpn
All American
17209 Posts
user info
edit post

i don't think so

9/2/2007 7:23:33 PM

Chief
All American
3402 Posts
user info
edit post

no, it isn't. was wondering myself, the website says construction should be through by the end of the month, though. Looks close to it, except maybe for the reseeding/sodding of the field at the end.

[Edited on September 2, 2007 at 7:33 PM. Reason : bleh]

9/2/2007 7:27:19 PM

JerryGarcia
Suspended
607 Posts
user info
edit post

It won't be done until mid-october at the earliest. The contractor who put down the base layer for the track fucked up. That has to be fixed before the surface is put down. I doubt it will be done before december.

9/3/2007 2:29:34 PM

Jackspa
Starting Lineup
68 Posts
user info
edit post

Actually, the athletic department wants a particular type of surface. And there is only one company that can install that type of surface. They own the patient. Being the only one company for this high-end surface means he is very busy. The surface should start this month.

9/4/2007 10:33:12 AM

gunzz
IS NÚMERO UNO
68205 Posts
user info
edit post

Quote :
"They own the patient"


wouldnt that be slavery?

9/4/2007 2:52:18 PM

shanedidona
All American
728 Posts
user info
edit post

what is the material called?

9/4/2007 2:59:34 PM

 Message Boards » The Lounge » Paul Derr Track Page [1]  
go to top | |
Admin Options : move topic | lock topic

© 2024 by The Wolf Web - All Rights Reserved.
The material located at this site is not endorsed, sponsored or provided by or on behalf of North Carolina State University.
Powered by CrazyWeb v2.39 - our disclaimer.